| 000 | 01280nam a2200205 a 4500 | ||
|---|---|---|---|
| 008 | 160425s2011 ||||||||||||||||| || u | ||
| 020 | _a9780821369852 | ||
| 050 | _aTK 1513.L28 Doi | ||
| 100 | _aPorter, Ian C | ||
| 245 | 1 | 0 |
_aDoing a dam better: the Lao People's Democratic Republic and the story of Nam Theun 2 _cEdited By Ian C, Porter and Jayasankar Shivakumar |
| 260 |
_aWashington D.C _bThe International Bank for Reconstruction _c2011 |
||
| 300 | _axviii, 189p.: ill. | ||
| 350 | _a25.00 | ||
| 650 | _aHYDROELECTRIC POWER PLANTS -- LAOS | ||
| 650 | _aECONOMIC DEVELOPMENT PROJECTS -- LAOS | ||
| 995 |
_aMAIN LIBRARY OPEN ACCESS _e746517 _FCBU-MAIN LIBRARY (Kitwe) _I25.00 _jTK 1513.L28 Doi _M3 _UAVAILABLE _WMay 10, 2016 _y746517 _ZMain Library Open Access Collection |
||
| 995 |
_aANNEX COLLECTION (Main Library) _e746160 _FCBU-MAIN LIBRARY (Kitwe) _I25.00 _jTK 1513.L28 Doi _M1 _UAVAILABLE _WMay 6, 2016 _y746160 _ZAnnex Low-Usage Collection |
||
| 995 |
_aMAIN LIBRARY OPEN ACCESS _e746518 _FCBU-MAIN LIBRARY (Kitwe) _I25.00 _jTK 1513.L28 Doi _M4 _UAVAILABLE _WMay 10, 2016 _y746518 _ZMain Library Open Access Collection |
||
| 995 |
_aANNEX COLLECTION (Main Library) _e746516 _FCBU-MAIN LIBRARY (Kitwe) _I25.00 _jTK 1513.L28 Doi _M2 _UAVAILABLE _WMay 10, 2016 _y746516 _ZAnnex Low-Usage Collection |
||
| 999 |
_c75617 _d75617 |
||